# | Checklist | Yes/No/Partially | Reference link | Owner | Remarks |
---|---|---|---|---|---|
1
Development is completed for all the features that are part of the release.
Yes
@Sandhya K
2
Test cases are documented by the QA team, reviewed by the product owners and test results are updated in the test cases sheet.
Yes
@Vasanth Kumar
3
The incremental demo of the features showcased during the sprint showcase and feedback incorporated. If possible list out the JIRA tickets for feedback.
Yes
@Satish N @Vasanth Kumar
Sprint Showcase (12-Dec-2022) and internal team demo(14-Sep-2022 ) with Product owner completed
4
UI/UX Audit review by UX Architect is completed along with feedback incorporation for any changes in UI/UX.
Yes
@Ramkrishna Sahoo @Antriksh Kumar
Audit completed (30-Nov-2022). Observations added in the card. PFM-1683
5
Incremental demos to the product owners are completed as part of the sprint and feedbacks are incorporated.
Yes
@Sandhya K
@Vasanth Kumar
6
QA signoff is completed by the QA team and communicated to the product owners. All the tickets QA signoff status is updated in the JIRA.
Yes
@Vasanth Kumar
QA sign-off done (20-Sep-22)
7
UI, API Technical documents are updated for the release along with the configuration documents.
Yes
@Sandhya K
8
UAT promotion and regression testing from the QA team is completed. QA team has shared the UAT regression test cases with the product owners.
Yes
@Vasanth Kumar. @Nirupama
UAT regression test cases. Signed off on 8-Dec-2022
9
API Automation scripts are updated for new APIs or changes to any existing APIs for the release. API automation regression is completed on UAT, the automation test results are analyzed and necessary actions are taken to fix the failure cases. Publish the list of failure use cases with a reason for failure and the resolution taken to fix these failures for the release.
No
@Vasanth Kumar
No API Automation for mgramSeva
10
The API backward compatibility testing is completed.
No
@Vasanth Kumar
No API Automation for mgramSeva
11
The communication is shared with the product owners for the completion of UAT promotion and regression by the QA team. The product owners have to give a Product signoff within one week of this communication.
Yes
@Nirupama Karanam @Satish N
QA Communication was done on 28-Nov-22 UAT Sign off was on 5-Dec-22 Product sign-off was on 9-Dec-22
12
UAT Product Signoff communication is received from the Product owners along with the release notes and User guides (if applicable).
Yes
@Satish N
Signed off on 9-Dec-2022
13
The GIT tags and releases are created for the code changes for the release.
Yes
@Sandhya K
14
Verify whether the Release notes are updated
Yes
@Sandhya K
15
Verify whether all UAT Builds are updated along with the GIT tag details.
Yes
@Vasanth Kumar
16
Verify whether all MDMS, Configs, InfraOps configs updated.
Yes
@snehal.gothe @Sandhya K
17
Verify whether all docs are published to mGram website by the Technical Writer as part of the release.
Yes
@Sandhya K
@Anjoo Narayan
18
Verify whether all test cases are up to date and updated along with necessary permissions to view the test cases sheet. The test cases sheet is verified by the Test Lead.
Yes
@Vasanth Kumar
19
Verify whether the UAT credentials sheet is updated with the details of new Users and Roles if any
Yes
@Vasanth Kumar
It will be internally shared.
20
Verify whether all the localisation data was added in UAT including Hindi and updated in Release Kits.
Yes
@Vasanth Kumar
21
Verify whether the product release notes and user guides are updated and published
Yes
@Satish N
22
The Demo of released features is done by the product team as part of the Sprint/Release showcase.
Yes
@Satish N
Release showcase done on 12-Dec-22
23
Technical and Product workshops/demos are conducted by the Engineering and Product team to the implementation team (Impel handover)
Yes
@Satish N @Arindam Gupta
Workshop Oct17, 22
24
Plan for upgrading the staging/demo instance with the release product - within 2-4 weeks based on the period where no demos are planned from staging for the previous version of the released product.
NA
25
Architect SignOff and Technical Quality Report
No
@Ghanshyam
No dedicated Architect to mgramseva & Phani has done code review during the dev cycle. As discussed in the show case, Ghanshyam would be doing the sign-off. Sandhya will be coordinating with ghanshyam on this. This will be taken after the release since we are already late for the product release.
26
Success Metrics and Product Roadmap
Yes
@Satish N
27
Adoption Metrics
Yes
28
Program Roll-out Plan
Yes
29
Impel checklist
Yes
@Arindam Gupta
30
Impel roll-out plan
Yes
@Arindam Gupta
31
Gate 2
Yes
Gate 2 Review is scheduled on 14-Dec-2022
32
The Internal release communication along with all the release artefacts are shared by the Engineering team.
Yes
@Sandhya K
Communication will be done by Engineering team 14-Dec-2022
33
The Release communication to partners is shared by the GTM team and the Webinar is arranged by the GTM team after the release communication - within 2-4 weeks of the release.
No
GTM Team